Description
EV charging hub + warehouse for sustainable last-mile delivery
DESCRIPTION
ChargeVault is a unique development at the De Liede business park near Amsterdam, purpose-built for large-scale electric vehicle charging and sustainable logistics. Featuring 318 grid-powered charging bays, it's the ideal solution for companies electrifying their last-mile fleets and meeting Amsterdam’s zero-emission targets. Centrally located in the Randstad area, ChargeVault offers a strategic hub for zero-emission urban distribution, e-commerce, and logistics operations. Benefit from overnight bulk charging that takes advantage of off-peak rates.
Beyond charging infrastructure, unlock the opportunity to develop a customized, high-quality warehouse facility. This build-to-suit option can be tailored to your specific requirements, integrating seamlessly with the charging infrastructure.
LOCATION
ChargeVault is strategically positioned in the De Liede business park, directly on the N205 (Haarlem Ring Road). Excellent accessibility to the A4, A5, A9, and A10 motorways ensures regional and national connectivity. Schiphol Airport is approximately 12 minutes away, Amsterdam Westpoort about 15 minutes, and Haarlem around 10 minutes. This location reinforces its role as a premier hub for distribution and fleet operations, ensuring seamless supply chain execution.
AVAILABILITY
The project offers flexible options to suit your specific needs:
- Outdoor Area: Approx. 14,000 sqm, including 318 electric charging bays for vans and commercial vehicles. Single and multi-let opportunities are available.
- Warehouse/Industrial Space (Optional): From 2,500 sqm up to approx. 4,000 sqm of customizable space (build-to-suit; cross-dock, conventional warehouse, and other layouts available in consultation).
- Office Space (Optional): Approx. 320 sqm of build-to-suit office space.
DELIVERY DATE
Delivery upon agreement, targeting Q4 2026.
RENTAL PRICE
Available upon request.
SERVICE CHARGES
To be determined, based on usage and services provided. Includes energy supply at grid cost with no built-in margin, maintenance of technical installations, and site management.
LEASE TERM
Upon request.
SPECIFICATIONS
The site includes:
- 318 electric charging points (22kW AC);
- 2MVA Grid Power Availability;
- Additional capacity available via solar panels (warehouse);
- Targeted Energy Label: A+++ (forecast);
- Fully paved, secured outdoor area suitable for heavy traffic;
- 24/7 security provision;
- Personal transport accessibility;
- Guard hut and welfare facilities;
- Bike parking;
- 4 HGV loading docks;
- 12m clear height;
- Possibility of additional facilities upon request (e.g., customized warehouse/office layouts).
ACCESSIBILITY
By Car:
- Directly on the N205, with quick access to the A4, A5, A9, and A10 motorways;
- Schiphol Airport: approx. 12 minutes;
- Amsterdam-Zuid: approx. 18 minutes.
DESCRIPTION
ChargeVault is a unique development at the De Liede business park near Amsterdam, purpose-built for large-scale electric vehicle charging and sustainable logistics. Featuring 318 grid-powered charging bays, it's the ideal solution for companies electrifying their last-mile fleets and meeting Amsterdam’s zero-emission targets. Centrally located in the Randstad area, ChargeVault offers a strategic hub for zero-emission urban distribution, e-commerce, and logistics operations. Benefit from overnight bulk charging that takes advantage of off-peak rates.
Beyond charging infrastructure, unlock the opportunity to develop a customized, high-quality warehouse facility. This build-to-suit option can be tailored to your specific requirements, integrating seamlessly with the charging infrastructure.
LOCATION
ChargeVault is strategically positioned in the De Liede business park, directly on the N205 (Haarlem Ring Road). Excellent accessibility to the A4, A5, A9, and A10 motorways ensures regional and national connectivity. Schiphol Airport is approximately 12 minutes away, Amsterdam Westpoort about 15 minutes, and Haarlem around 10 minutes. This location reinforces its role as a premier hub for distribution and fleet operations, ensuring seamless supply chain execution.
AVAILABILITY
The project offers flexible options to suit your specific needs:
- Outdoor Area: Approx. 14,000 sqm, including 318 electric charging bays for vans and commercial vehicles. Single and multi-let opportunities are available.
- Warehouse/Industrial Space (Optional): From 2,500 sqm up to approx. 4,000 sqm of customizable space (build-to-suit; cross-dock, conventional warehouse, and other layouts available in consultation).
- Office Space (Optional): Approx. 320 sqm of build-to-suit office space.
DELIVERY DATE
Delivery upon agreement, targeting Q4 2026.
RENTAL PRICE
Available upon request.
SERVICE CHARGES
To be determined, based on usage and services provided. Includes energy supply at grid cost with no built-in margin, maintenance of technical installations, and site management.
LEASE TERM
Upon request.
SPECIFICATIONS
The site includes:
- 318 electric charging points (22kW AC);
- 2MVA Grid Power Availability;
- Additional capacity available via solar panels (warehouse);
- Targeted Energy Label: A+++ (forecast);
- Fully paved, secured outdoor area suitable for heavy traffic;
- 24/7 security provision;
- Personal transport accessibility;
- Guard hut and welfare facilities;
- Bike parking;
- 4 HGV loading docks;
- 12m clear height;
- Possibility of additional facilities upon request (e.g., customized warehouse/office layouts).
ACCESSIBILITY
By Car:
- Directly on the N205, with quick access to the A4, A5, A9, and A10 motorways;
- Schiphol Airport: approx. 12 minutes;
- Amsterdam-Zuid: approx. 18 minutes.
Map
Map is loading...
Cadastral boundaries
Buildings
Travel time
Gain insight into the reachability of this object, for instance from a public transport station or a home address.